The paths in the garden are an integral part of the summer cottage. Their most basic functions is the division of space into certain zones, as well as the opportunity to move freely in any weather in the territory of the cottage. Currently, there are a huge number of materials and technologies for independent construction of various types of paths, and today we will consider this issue more thoroughly and detailed.
The very first step is the planning and marking of future paths. All this should be done taking into account the fact that the approach and access to all objects on your garden plot should be as simple and convenient as possible. It is also worth paying direct attention to the width of the country paths, too narrow paths can cause inconvenience when moving more than one person on them, and too wide will take a lot of useful areas, which could be used more rationally. During planning and markings, it is worth avoiding unnecessary turns and bends if you want to save your time and costs of building materials, the most optimal is the location of the paths along the shortest path between the country objects. To avoid the most common misconceptions when designing tracks, we will consider the moments that you should pay attention to. The main rule is the use of a minimum of intersections, as they are very negatively affected by planning. The total area of garden paths should not ideally exceed 20% of the country space. And the last one is definitely worth paying attention to this width, 70 centimeters are enough to ensure the convenience of moving more than one person along it.
After the marking and layout is completed, you can proceed directly to the power of the paths. It is worth starting with the so-called preparation of the “trough”, the so-called the liberation of the area on which the path will be located, from the ground and turf about 20-25 centimeters. After that, the entire space is covered with geotextiles, on which crushed stone is filled up and then thumbs thoroughly. Buy gravel now can not be expensive and with delivery. The next step is to water the resulting structure and subsequent drying, so the crushed stone will fit quite tightly on the surface and will not cause any problems later. This stage is called the manufacture of a pillow.
You can start work by power with any part of the path convenient for you. When using natural stone, large stones should first be used, and after the smaller ones, the remaining gaps between the stones several millimeters will save the path from cracking in the winter, they are usually covered with sand or some similar material, and then dried.
When using brick as a building material, concrete pouring is prepared on the surface of crushed stone, into which a brick is subsequently pressed, this option is very durable and long -term.
When using gravel, as the basics during construction, it should be taken into account that the “trough” should be a little deeper than with other options, this will avoid pulling small stones when using.
And finally, we will discuss things that you should definitely take into account when. Without a pillow, it is strictly not recommended to use concrete filling and subsequent laying of the material on it, since your creation will turn out to be short -lived. When the stone is resisted, it is necessary to leave the gaps between the elements in order to avoid deformation of the canvas from the thermal expansion. A very convenient tool for adjusting the paving elements is an ordinary rubber kiyanka.